Shenzhen East Waste-to-Energy Power Plant

Shenzhen East Waste-to-Energy Power Plant

Shenzhen East Waste-to-Energy Power Plant Project is located in Sifang Po Community, Pingdi Street, with a total area of about 543000 square meters (267000 square meters in the main plant area and 2.76 million square meters in the ash comprehensive utilization field) and a total investment of about 4.4 billion yuan. The design scale is to treat 5000 tons of domestic waste per day, and build 6 850 tons/day waste incineration treatment production lines. The steam generated by the waste heat boiler is used for 3 60MW turbo-generator units, with an annual power generation capacity of about 0.6 billion degrees. The flue gas emission index is better than the current national standard GB18485-2014) and the EU standard (2010/75/EU).

China Everbright Greentech Limited

China Everbright Greentech Limited

Fiberhome Communications

Fiberhome Communications

Deren Electronic

Deren Electronic

ThyssenKrupp

ThyssenKrupp

Deutz FAW

Deutz FAW

Shenzhen Water Group

Shenzhen Water Group

Follow us

Follow us

Hotline

400-830-3586

Shenzhen Headquarters

Add:313, Building B, Chuangjin 1, No. 125 Chuangye 2nd Road, Bao'an District, Shenzhen
Tel:+86-755-23890707
Fax:+86-755-23883586-806

 

Wuhan Branch

Add:Building 5, No. 9 Fozuling Fourth Road, Donghu New Technology Development Zone, Wuhan
Tel:+86-27-81808069
Fax:+86-27-81808069-622

 

Business email:sales@hisrec.com

HR email:hr@hisrec.com


Copyright © 2022 Shenzhen Hisrec Electrical Technology Co., Ltd. All rights reserved.