Shenzhen East Waste-to-Energy Power Plant
Shenzhen East Waste-to-Energy Power Plant Project is located in Sifang Po Community, Pingdi Street, with a total area of about 543000 square meters (267000 square meters in the main plant area and 2.76 million square meters in the ash comprehensive utilization field) and a total investment of about 4.4 billion yuan. The design scale is to treat 5000 tons of domestic waste per day, and build 6 850 tons/day waste incineration treatment production lines. The steam generated by the waste heat boiler is used for 3 60MW turbo-generator units, with an annual power generation capacity of about 0.6 billion degrees. The flue gas emission index is better than the current national standard GB18485-2014) and the EU standard (2010/75/EU).
China Everbright Greentech Limited
Fiberhome Communications
Deren Electronic
ThyssenKrupp
Deutz FAW
Shenzhen Water Group
Follow us
Hotline
400-830-3586
Shenzhen Headquarters
Add:313, Building B, Chuangjin 1, No. 125 Chuangye 2nd Road, Bao'an District, Shenzhen
Tel:+86-755-23890707
Fax:+86-755-23883586-806
Wuhan Branch
Add:Building 5, No. 9 Fozuling Fourth Road, Donghu New Technology Development Zone, Wuhan
Tel:+86-27-81808069
Fax:+86-27-81808069-622
Business email:sales@hisrec.com
HR email:hr@hisrec.com
Copyright © 2022 Shenzhen Hisrec Electrical Technology Co., Ltd. All rights reserved.